NNPCL Mobilizes Trucks To Dangote Refinery.

The Nigeria National Petrol Company Limited (NNPCL) has announced that it has commenced mobilization of trucks to the Dangote Refinery’s fuel loading gantry in Ibeju- Lekki.

The NNPCL had earlier announced that offloading of the Premium Motor Spirit (PMS), commonly called Petrol will begin on Sunday September 15, 2024.

It noted that as of Saturday afternoon, over 100 trucks, with hundreds more en route had being deployed.

The announcement was made in a tweet by the Commission on Saturday evening.

The Tweet reads, ‘In Preparation for the Dangote Refinery’s scheduled petrol loading on Sunday, September 15, 2024, NNPC Ltd.has been mobilizing trucks to the Refinery’s fuel loading gantry in Ibeju-Lekki.

As of Saturday afternoon, NNPC Ltd. had deployed over 100 trucks with hundred more en route’, it added.

Meanwhile Reactions have trailed this recent development from Netizens who expressed their views with regards directive from NNPCL.

According to Anwuchugum John Daniel ‘ I’m a little bit concerned that the deployment of fuel tankers and availability of products does not in anyway address cost and affordability. I think they should focus on making these products affordable to Nigerians. Fuel is a key driver of the Nigerian economy considering the failure in the power sector. Making fuel available when no one, or most Nigerians can’t afford it makes no sense either.

Adamu Garkin Yusuf also had this to say’ Have we actually planned for the Lekki Ajah expressway and consider the present road transportation, bridges, intersection, alternative routes, and expansion of supporting infrastructures at the pick up of such a huge project?

I think it is time to utilise and take the full potentials of the waters connectivity and system on the River Niger And Benue For easy deliver of Dangote Refinery’s products. Settling in place mini mega port at Kogi, Benue, Adamawa, Port Harcourt, Enugu, Delta and possibly Anambra Among others.

Decentralization is key. However, the water ways would nerd dredging while in a look run the third mainland bridge will be over stretched to accommodate easy flow of traffic.

Published by Ayobo/IpajaTV

a media scion and creative bug

Leave a comment

Design a site like this with WordPress.com
Get started